USACE Egyptian Navy Dredging (2015):

In 2015, Interdyne completed work on USACE MED Contract #W912ER-15-P-0006, performing dredging work at the Ras El Tin Egyptian Navy Base Synchrolift Ship lift platform. This was a complicated dredging project, as years of shiplift use left a significant layer of debris in the harbor, lodged under the dock and shiplift. However, Interdyne was able to adjust to these unforeseen circumstances and remove the layer of debris & waste with grab cranes in order to successfully complete the dredging process to the US Government’s satisfaction. We also removed the old timbers and replaced them with new timbers. Sonar depth measurements were taken to ensure the correct dredging levels had been achieved.